Yashyl Depe water pumping station with a capacity of 2.13 cubic meters per second will be built in the Ak Bugday district of Ahal province and the Kahka district of Ahal province - the first and second lifts of "Govshut" pumping station with the capacity of 4.15 cubic meters per second.
For this purpose, the Ministry of Construction and Architecture of Turkmenistan announces an international tender by order of the Ministry of Agriculture and Environmental Protection of Turkmenistan for the construction of Yashyl Depe water pumping station, water pumps and pressure pipelines for the installation of water supply and electric motors, as well as for the reconstruction of the electrical substation and an international tender for the construction of the first and second lift of the pumping station "Govshut" with a capacity of 4.15 cubic meters per second.
Applications and proposals of interested parties are accepted in the prescribed manner and registered in the Department of Marketing and Foreign Economic Relations of the Ministry of Construction and Architecture of Turkmenistan.
Applications for participation in the tender are accepted until September 7, 2023.