Installation and commissioning of the main and auxiliary equipment was completed at the new drinking water plant in Lebap’s Halach etrap. The plant is located near the Esenmengli main canal, which originates from the Amu Darya.
A water treatment complex with a design capacity of 30 thousand cubic meters of high-quality drinking water per day is being built as part of the implementation of the General Program for the provision of settlements of Turkmenistan with clean drinking water.
The technological parameters of a water treatment plant equipped with high-tech equipment include multiple purification, settling, filtering and disinfection of water. All processes will be automated.
Upon completion of the laying of water supply networks with a total length of about 80 kilometers to settlements in the eastern region, another modern plant will begin operating that will provide the population with clean drinking water.
Today, modern water treatment plants operate in the Koytendag, Charjew, Farab, Hojambaz etraps and a large drinking water plant operates in the city of Turkmenabat. The construction of similar objects is underway in the etraps of Darganata, Dyanev, Sakar and Dovletli.